On August 30, 2025, Madrid hosted the Hyperlink’s most ambitious edition to date, with its Open Air + Afterparty held at the Madrid Drive-In Cinema during the day and at La Riviera Hall during the night, totaling 14 hours of non-stop music and partying.

From 3:00 PM until late at night, the Drive-In Cinema opened its doors so attendees could enjoy a nonstop rave, guaranteeing an immersive experience from the very beginning. The party then moved to La Riviera with the official Afterparty, extending the musical vibe into the early hours.

The organizers of Hyperlink promised it would be “their most extreme edition” and, according to their own assessment, it was: an intense, high-energy day with a massive turnout from the early hours. Many attendees highlighted the festive atmosphere, the collective atmosphere, and the feeling that the festival had marked a turning point in the local calendar.

Thanks to BW Music, the festival’s producer, Fluge Audiovisuales was responsible for providing the sound, lighting, and video equipment for the event at the Madrid Drive-In Cinema. Below is a breakdown of the highlights:

SOUND – P.A. SYSTEM

14 d&b J8

18 d&b J-SUB

4 d&b J12

18 d&b D-80

SOUND – FRONTFILL

8 d&b Q-7

2 d&b D-80

SOUND – VIP AREA

6 L’ACOUSTIC KARA

2 L’ACOUSTIC LA 12X

2 L’ACOUSTIC SB-28

SOUND – DJ BOOTH

6 L’ACOUSTIC KARA

2 L’ACOUSTIC LA 12X

2 L’ACOUSTIC SB-28

SOUND – FOH CONTROL

1 DIGICO SD10

LIGHTNING

16 ROBE MEGAPOINTE

6 ROBE TARRANTULA LED WASH

2 MARTIN ERA 800 PERFORMANCE

12 CHAUVET COLOR STRIKE

VIDEO – LED SCREENS

1 LED display 8 x 5 meters flown and 3.91 mm pitch